Bhitti Bhai Logo
BHITTI BHAI
Civil Estimator — BNBC 2020
BNBC 2020
ভিত্তি হোক জ্ঞানের |
← All Tools
BNBC 2020 Compliant — Mix ratios per Part 6 Ch.5  |  Min. steel % per BNBC Table 6.6.1  |  Cover per BNBC 6.3.7  |  Piles per BNBC Part 7 Ch.2  |  Stair dims per BNBC 4.2.5  |  Labor per PWD Schedule of Rates
⚙ Material Unit Rates
🪨
Cement OPC 50kg (bag)
Coarse Sand (cft)
🪨
Stone Chips 20mm (cft)
🔩
Rebar BSRM/KSRM (kg)
🧱
1st Class Brick (pcs)
🌊
Water (per 1000L)
👷 Labor Rates (PWD Schedule)
🏛
RCC Work (per cft)
🔩
Bar Bending (per kg)
🧱
Brickwork (per cft)
🪣
Plastering (per sft)
Tile Fixing (per sft)
🏗
Pile Driving (per rft)
Excavation (per cft)
🔧
Formwork (per sft)
🏛 Column Estimation
━ Beam Estimation
▭ Slab Estimation
⬜ Floor Finish Estimation
🏗 Foundation / Footing Estimation
🧱 Wall Estimation
🔩 Pile Estimation — BNBC 2020 Part 7 Ch.2
⬡ Pile Cap Estimation — BNBC 2020 Part 7 Ch.2.7
🪜 Staircase Estimation — BNBC 2020 Part 4
📋 Bill of Quantities
BOQ Line Items
#Description of WorkUnitQuantityUnit RateAmount
Sub Total
VAT / AIT (5%)
Contingency (3%)
Grand Total
📊 Project Summary

📐 Quantity Summary

💰 Cost Breakdown

Total Concrete
0 cft
Total Steel
0 kg
Material Cost
Labor Cost
BOQ Total
Grand Total
Done