BHITTI BHAI
Civil Engineering Estimator
BNBC 2020
← All Tools
LIVE CALCULATOR ACI 318 COMPLIANT PWD RATES
BNBC 2020 Bangladesh National Building Code — All calculations comply with BNBC Part 6 (Structural Design), Part 7 (Foundations & Geotechnical), ACI 318-19, and PWD Schedule of Rates. Material wastage and labor productivity factors applied per local practice.
📦 Material Unit Rates
🪨
Cement OPC 50kg/bag
🏖
Coarse Sand (cft)
🪨
Stone Chips 20mm (cft)
🔩
Rebar BSRM/KSRM (kg)
🧱
1st Class Brick (pcs)
🪵
Tiles — Ceramic 12×12 (sft)
🪵
Tiles — Homogeneous 24×24 (sft)
🪵
Tiles — Granite/Marble (sft)
👷 Labor Unit Rates
🏗
RCC Work (cft)
🔩
Bar Bending (kg)
🧱
Brickwork (cft)
🪣
Plastering (sft)
🪵
Tile Fixing (sft)
⚙️
Pile Driving (rft)
Excavation (cft)
🪚
Formwork (sft)
🏛 RCC Columns
━ RCC Beams
▭ RCC Slabs
🪵 Floor Finishes
🏗 Foundations
🧱 Walls (Brickwork)
⚙️ Piles — Cast-in-Situ (BNBC Part 7)
🔲 Pile Caps
🪜 Staircase
📋 Bill of Quantities (BOQ)
# Description of Work Unit Qty Rate Amount
Sub Total
0.00
VAT/AIT 5%
0.00
Contingency 3%
0.00
Grand Total
0.00

📦 Quantity Summary

No calculations yet.

💰 Cost Summary

No cost data yet.
Total Concrete
— cft
Total Steel
— kg
Material Cost
Labor Cost
BOQ Total
Grand Total